Permit service
Most people learn they have an open permit at the worst possible moment: under contract, two weeks from closing, when the municipal lien search comes back. The permit might be from a roof replaced in 2016 or a water heater swapped by a previous owner. Whatever the story, it has to be resolved, and the clock is running. This is the problem we solve more than any other.

Why open permits surface during closings
When a home goes under contract in Sarasota, the buyer's title company orders a municipal lien search. That search pulls the property's permit record from Sarasota County or the City of Sarasota, and it lists every permit that was ever issued along with its current status. Anything that says open or expired lands in the report, and from that moment it is a problem on the closing table.
Buyers and their lenders treat unresolved permits as unfinished business, because that is exactly what they are. An open permit means the government approved work on the house and never confirmed it was finished safely. Some buyers walk. More often, the buyer's side demands the permits be resolved before closing, or demands money held in escrow until they are. Either way, the seller now has a paperwork project with a hard deadline they did not choose.
The frustrating part is that the work itself is usually fine. The roof was installed, the A/C runs, the water heater heats. Somebody just never called in the final inspection, and the file sat open until it quietly expired. The house is not the problem. The record is.
What open and expired actually mean
An open permit is a permit that was issued but never received its passing final inspection. The file is still active, waiting for someone to finish the process.
An expired permit is an open permit that timed out. Under the Florida Building Code, a permit expires when the work stops for 180 days without an approved inspection. Once that happens, you cannot simply call in the final. The permit has to be brought back to life first, which, depending on its age and the jurisdiction, can mean a renewal, a reactivation fee, or a new application that references the old work.
The distinction matters because it changes the fix. An open permit from last year might need one inspection. An expired permit from 2014 might need research just to establish what was approved, which contractor pulled it, whether that contractor still exists, and what the office will require to consider the matter closed. That research is the heart of this service.
How we resolve them, step by step
Every engagement starts with the record, not with guesses. Here is the process we run:
First, we pull the complete permit history for the property from the county's Accela system or the City of Sarasota's permit records, depending on the jurisdiction. We identify every item that is open, expired, or in any status other than closed, and we read each file: what was permitted, when, what inspections passed, and where the process stopped.
Second, we build a resolution plan. For each unresolved permit, we determine what the issuing office actually requires to close it. Sometimes that is a single final inspection. Sometimes it is an affidavit from a licensed contractor confirming the work was completed to code. Sometimes the original contractor is long gone and the office needs the current owner to take over the permit before anything can proceed. We lay this out for you in plain English with a flat written fee for the whole job, so you know what you are dealing with before you spend a dollar. If you want to see how we structure fees, our pricing page explains it.
Third, we execute. We file the paperwork, coordinate contractor sign-offs where required, schedule the inspections, and make sure someone is on top of every date. If an inspection fails, we find out exactly why, translate the inspector's notes into an action item, and coordinate the correction with your contractor before rescheduling.
Finally, we confirm closure in the official record. A permit is not resolved when the inspector leaves happy. It is resolved when the county or city system says closed. We check, and we send you that confirmation in writing, because the whole point is that the next lien search comes back clean.
Sellers: resolve before you list, not during escrow
The single best time to fix permit problems is before the house hits the market. A permit history report before listing shows you exactly what a buyer's lien search will find, while you still control the timeline. Resolving an expired permit on your own schedule is a manageable project. Resolving it in the last three weeks of escrow, with a buyer threatening to walk and a lender refusing to fund, is the same project with a gun to your head.
Real estate agents in Sarasota see this constantly, which is why many of the calls we get come from the listing side. If you represent sellers, building a permit check into your pre-listing routine costs little and prevents the worst kind of eleventh-hour surprise.
Buyers: do not inherit someone else's open permit
When you buy a property, you buy its permit record too. An open permit does not disappear at closing; it attaches to the property, and the new owner becomes the person the county or city looks to when the issue finally surfaces. If you are buying and the lien search shows unresolved permits, you have leverage right now that you will never have again. Insist they be resolved, or price the resolution into the deal with real numbers. We can tell you quickly what each open item would take to close, which turns a vague scary line on a report into a concrete cost you can negotiate with.
The jurisdiction wrinkle
Sarasota County and the City of Sarasota keep separate permit records and run separate processes for reactivating and closing old permits. A house in Gulf Gate is a county matter handled through Accela. A bungalow near downtown is a City of Sarasota matter handled through the city's Building and Permitting division. Same problem, different counter, different checklist. Because we work in both systems every week, we do not spend your billable time learning which one applies. Confirming jurisdiction is the first thing we do in every free assessment.
When not to hire us
Honesty matters more than a sale. If your lien search shows one open permit from last year, the contractor is still in business, and all it needs is a final inspection the contractor is willing to schedule, you may not need us. Call the contractor first. Where we earn our fee is everything messier: multiple open items, expired permits, vanished contractors, out-of-state sellers, tight closing dates, or any situation where nobody is sure what the record even says. If you send us the details and it turns out to be a five-minute fix you can do yourself, we will tell you that for free.
Start with the record
Whether you are selling, buying, or just cleaning up after a previous owner, the first step is the same: find out exactly what the record says. Send us the property address through our free assessment and we will pull the permit history, flag everything unresolved, and come back with a plan and a flat written fee, usually the same business day. You can also contact us with a question first; a real local person answers either way.
What's included
Full research of every open and expired permit on the property A plain-English resolution plan for each item, with a flat written fee Coordination with contractors for sign-offs and affidavits where required Reactivation or reapplication for expired permits Inspections scheduled, tracked, and driven to a passing final Written confirmation when each permit shows closed in the official record
Where we run this service
Related work
Also on our desk

Residential Permit Expediting
Your home project needs a permit. We prepare the application, submit it to the right office, track the review daily, and carry it through inspections to a closed permit.
Learn more →
Contractor Permit Running
Your crew should be building, not babysitting portals. We run your permit volume: complete submittals, daily queue checks, corrections handled, inspections scheduled, files closed.
Learn more →
Permit Research & History Reports
Know what the permit record says before someone else finds out for you. A plain-English report of every permit on a property: what exists, what is open, and what is missing.
Learn more →
Unpermitted Work & After-the-Fact Permits
Work got done without a permit, by a previous owner, a handyman, or before you knew better. We map what is unpermitted and run the legalization process to a closed permit.
Learn more →
Owner-Builder Permit Assistance
Florida lets you pull your own permit as an owner-builder, with real obligations attached. We handle the paperwork and process so doing it yourself does not mean doing it alone.
Learn more →
Inspection Scheduling & Permit Closeout
The last mile of every permit: inspections called at the right moments, failures triaged fast, and the file driven to closed status so it never resurfaces at a closing.
Learn more →Answers
Questions about Open & Expired Permit Resolution
How long does it take to close an open permit?
Can a home sale close with an open permit?
The contractor who pulled the permit is out of business. Now what?
What if the work behind the open permit was never actually finished?
Do open permits really expire after 180 days?